Skip approvals. Skip delays. Add space faster.
No council approval.
No drawn-out build.
Prefabricated backyard pods under 20m²* — designed for fast setup and immediate use.
Skip approvals. Skip delays. Add space faster.
No council approval.
No drawn-out build.
Prefabricated backyard pods under 20m² — designed for fast setup and immediate use.
Extra space. Without the usual hold-ups.
Adding a backyard room usually means dealing with council approvals, long timelines and multiple trades.
The NextGen Pod is different.
Each pod is designed under the 20m² threshold, meaning you can avoid the approval process that slows most builds down.
No waiting months for approvals. No overcomplicated construction process. Just a prefabricated system that arrives ready to install and gets you up and running faster.
Built to move faster
01
No council approval required (under 20m²)
02
Faster than traditional backyard builds
03
Prefabricated for efficient installation
04
Minimal disruption on site
05
Built using the proven NextGen system
Less red tape.
Less time on site.
More usable space.
Use it your way
The pod is designed to be simple, flexible and ready to use.
Use Cases:
-
Home office -
Creative studio -
Teenager retreat -
Gym or wellness space -
Hobby room -
Quiet workspace
Two sizes. Ready when you are.
Both options are designed to stay under the 20m² threshold, keeping the process simple and approval-free.
Option 1
2.4m x 3.6m Pod
$18,400
Inclusions
-
Internal ply lining -
1 × window (925 x 925) -
1 × sliding door (2000 x 2000) -
1 × downlight -
2 × power points -
Insulation
A compact setup for a focused workspace or studio.
Option 2
2.4m x 4.8m Pod
$22,300
Inclusions
-
Internal ply lining -
1 × window (925 x 925) -
1 × sliding door (2000 x 2000) -
2 × downlights -
2 × power points -
Insulation
More room to move, ideal for a full office or multi-use space.
Same system. Same fast setup. Just choose the size that suits.
From delivery to done — fast
STEP 01
Order your pod
Choose your size and get the details.STEP 02
Manufactured off-site
Prepared using the NextGen prefabricated system.STEP 03
Delivered flat-pack
Everything arrives ready to go.STEP 04
Install with your builder
Your builder or carpenter assembles the pod on site.
No drawn-out build. No unnecessary steps.
Just a faster way to get usable space.
Straightforward from the start
NextGen manufactures and supplies the pod system.
Your builder or carpenter completes installation.
While the pod is designed to avoid council approval by staying under 20m², requirements may vary depending on your local council and site conditions.
Skip the approvals.
Get the space.
Tell us what you’re planning and we’ll send through everything you need to get started.
Request Pod Details
Get in Touch Today
Ready to take your projects to the next level? Contact us today to discuss your next build.
