Skip approvals. Skip delays. Add space faster.

No council approval.
No drawn-out build.

Prefabricated backyard pods under 20m²* — designed for fast setup and immediate use.

Skip approvals. Skip delays. Add space faster.

No council approval.
No drawn-out build.

Prefabricated backyard pods under 20m² — designed for fast setup and immediate use.

Extra space. Without the usual hold-ups.

Adding a backyard room usually means dealing with council approvals, long timelines and multiple trades.

The NextGen Pod is different.

Each pod is designed under the 20m² threshold, meaning you can avoid the approval process that slows most builds down.

No waiting months for approvals. No overcomplicated construction process. Just a prefabricated system that arrives ready to install and gets you up and running faster.

Built to move faster

01

No council approval required (under 20m²)

02

Faster than traditional backyard builds

03

Prefabricated for efficient installation

04

Minimal disruption on site

05

Built using the proven NextGen system

Less red tape.
Less time on site.
More usable space.

Use it your way

The pod is designed to be simple, flexible and ready to use.

Use Cases:

Two sizes. Ready when you are.

Both options are designed to stay under the 20m² threshold, keeping the process simple and approval-free.

Option 1

2.4m x 3.6m Pod

$18,400

Inclusions

A compact setup for a focused workspace or studio.

Option 2

2.4m x 4.8m Pod

$22,300

Inclusions

More room to move, ideal for a full office or multi-use space.

Same system. Same fast setup. Just choose the size that suits.

From delivery to done — fast

STEP 01

Order your pod

Choose your size and get the details.
STEP 02

Manufactured off-site

Prepared using the NextGen prefabricated system.
STEP 03

Delivered flat-pack

Everything arrives ready to go.
STEP 04

Install with your builder

Your builder or carpenter assembles the pod on site.

No drawn-out build. No unnecessary steps.

Just a faster way to get usable space.

Straightforward from the start

NextGen manufactures and supplies the pod system.

Your builder or carpenter completes installation.

While the pod is designed to avoid council approval by staying under 20m², requirements may vary depending on your local council and site conditions.

Skip the approvals.
Get the space.

Tell us what you’re planning and we’ll send through everything you need to get started.

Get in Touch Today

Ready to take your projects to the next level? Contact us today to discuss your next build.